Cleaning construction sites at White Palace Convention Center

                           In the process of executing the electro-mechanical construction project at White Palace, Rapid Vietnam M&E Co., Ltd not only undertakes the responsibility of designing and constructing the electrical, pumping, air conditioning, fire protection, and water supply and drainage systems but also sets high standards for hygiene and occupational safety. 

Every day after work, the team of engineers and workers from Rapid Vietnam conducts thorough and systematic cleaning of the construction site. This work includes:

-         Collecting and Sorting Construction Waste:  Various types of waste such as packaging, electrical wire coverings, plastic pipes, and construction debris are collected and sorted for recycling or proper disposal according to regulations.

-         Sweeping and Cleaning the Work Areas: Floors and work areas are swept clean, removing dust and small debris to ensure safety for workers as well as students and faculty in the vicinity.

-         Organizing and Storing Surplus Materials: Usable construction materials such as steel pipes, electrical wires, and water pipes are neatly organized and stored in designated areas to avoid clutter and loss.

-         Inspecting and Maintaining Construction Equipment: Equipment such as drills, cutters, and other handheld tools are regularly inspected and maintained to ensure they operate safely and effectively for future use.

Maintaining a clean construction site not only ensures occupational safety for engineers and workers but also creates a positive work environment, enhancing job efficiency. An engineer shared, "Cleaning at the end of the day helps us work more efficiently the next day. A clean work environment is also a way to respect our job and ensure everyone's safety."

Another worker added, "Cleaning is not just an additional task but a responsibility for everyone. When the work environment is clean, we feel more comfortable and confident in our work."

The cleaning activities at the White Palace Convention Center construction site are an integral part of Rapid Vietnam M&E Co., Ltd.'s construction process. The diligent work ethic, teamwork, and commitment to cleanliness displayed by the engineers and workers are valuable attributes that should be maintained and promoted. With continuous efforts, Rapid Vietnam is certain to achieve further success in the future, enhancing the reputation and quality of the projects the company undertakes.

Phan Binh
Date 02/08/24

News Featured